Are you building a new home? You may have booked a package of new home construction inspections to be carried out at each crucial stage of your build.
You may be wondering what kind of defects our inspectors look for – and what they find – during each stage – base, frame, lockup/pre-plaster, fixing and final (PCI).
Below you will find examples of the issues our inspectors have found at each inspection stage.
These are examples from actual inspections we have carried out.
BASE STAGE INSPECTION
This stage is inspected before the concrete is poured. This enables the inspector to check that the workmanship is to an acceptable standard and that good quality control measures are in place.
Issue: The stormwater pipe is missing to the front porch column.
Issue: The trench mesh needs to be fully supported in areas to provide the correct placement of concrete.
FRAME STAGE INSPECTION
At this stage, the frame has been completed and approved by the building surveyor.
Area: Windows
Issue: The windows are fitted but they are not plumb or level. Steel flat-head framing gun nails have been used. These need to be replaced with a non-rusting galvanised bullet head type.
Area: Garage Rear Door Frame
Issue: The external timber door frame needs to include a weather membrane under the door threshold/sill in the form a sill flashing pan. This means that under the door sill there needs to be a water membrane that protects the subfloor/slab from water penetration. The front of the flashing overlaps the slab so that any water that gets under the door sill is channelled back outdoors.
LOCK-UP / PRE-PLASTER STAGE
At this stage, the roof coverings are fixed, external doors and windows are fixed, even if temporarily. Wall cladding may be only partly complete and will be inspected at future stages, depending on the build process.
Area: Kitchen
Issue: There appears to be no exhaust flue for the rangehood.
Area: Window
Issue: The window header/ledger framing is loose and requires making flush. The settlement clearance is less than the required minimum of 10mm – see arrow and red markings.
Area: Roof
Issue: The guttering is sagging and the roof sheeting end corrugations are visible, see arrow.
Area: Kitchen
Issue: Kitchen benchtop is bowed, see arrow.
Fixing Stage Inspection
At this stage, internal cladding, architraves, skirting, doors, sinks, cabinets and cupboards are now fixed into position.
Area: Staircase
Issue: The stair handrail is not flush with the wall.
Final (PCI) Inspection
This is also called a handover inspection. At this stage, internal cladding, architraves, skirting, doors, sinks, cabinets and cupboards are now fixed into position.
Area: Doors
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Issue: There is an excessive door margin, see arrow and ruler as gauge. The door requires paint sealing to all edges.
Area: Sink
Issue: Silicone sealant is required between the sink and bench top – see arrow and mirror.
If you are building a new home or plan to in the near future, get in touch with us.
We can assist with a range of inspections and specialised services.
At the contract stage? It pays to get the advice of an independent professional such as a building inspector to look at your contract and review it professionally.
We can provide the reassurance of a professional contract review.
We can assist you at each stage of your new home build with an independent new home construction inspection at each stage – base stage, frame stage, lockup/pre-plaster, fixing and final inspection (also called handover or PCI stage).
We also arrange stand-alone final (PCI) inspections and maintenance inspections, which occur within the warranty period of your new home.
If you find yourself in dispute with your builder, our qualified inspector can assist with a professional VCAT report and expert witness testimony.
If your new home is an investment property, call us to arrange a tax depreciation schedule and make the most of your tax deductions as a property investor.